Modelling levelised cost of hydrogen under scenario based circumstances for India for Solid Oxide Electrolysis
Levelised Cost of Hydrogen – PEM
While using SOE technology the LCOH is projected to be USD 8.86/kWh by 2050 under Base Case Scenario while electricity is being fed through grid. Further, the LCOH is expected to be USD 9.55/kWh & USD 8.17/kWh under High Case Scenario &am
Electrolyser Capex
Stack Cost
BoP Cost
PEM Electrolysis
Renewables
Solar
Wind
Green Hydrogen
Levelised Cost of Hydrogen – PEM
While using SOE technology the LCOH is projected to be USD 8.86/kWh by 2050 under Base Case Scenario while electricity is being fed through grid. Further, the LCOH is expected to be USD 9.55/kWh & USD 8.17/kWh under High Case Scenario & Low Case Scenario respectively by 2050.
Under base scenario the LCOH comes out to be USD 7.48/kWh in 2020 while using power through grid. Further, LCOH comes out to be USD 6.73/kWh while feeding power through solar & USD 6.60/kWh while feeding power through wind under in 2020.
Grid Fed: Under base case scenario the LCOH for year 2020 & 2050 comes out to be USD 7.18/kWh & USD 8.86/kWh respectively. Under lower case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.99/kWh & USD 8.17/kWh respectively. Under high case scenario the LCOH for year 2020 & 2050 comes out to be USD 7.91/kWh & USD 9.55/kWh respectively.
Solar Fed: Under base case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.73/kWh & USD 7.72/kWh respectively. Under lower case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.5/kWh & USD 7.38/kWh respectively. Under high case scenario the LCOH for year 2020 & 2050 comes out to be USD 6.88/kWh & USD 8.07/kWh respectively.
Complete the form to connect with our sales team and see the Visionboard platform in action.
Discover how Eninrac helps your teams eliminate poor market research experiences and drive actionable insights.